Monday, June 25, 2012

Still plugging along...

Feels like is has been a while since I have posted... maybe because so much has been going on.
Okay so in the last 2 weeks we have:
1. Almost all our plumbing completed (our refrigerator had to be re-plumbed since I moved it)
2. Our water turned on
3. all electrical finished and inspection passed
4. All outlets and switches installed
5. Stairs finished
6. Ceiling painted
7. All cabinets installed and ready for handles
8. The stucco guys have will finish their job within the next day or so. They are only doing bands around the windows to assure no water gets in
9. The hardy board is going up ...

The side of the house facing Granada before..
the side of the house facing Granada after :)
The back of the house
The completed Kitchen
refrigerator with build ins

Sunday, June 10, 2012

Finishing up!!

Both boys are inside this super fun box!!

The boys upstairs bathroom


light switches in the boys room

one of the lofts??

Spare room/nursery

Loft space #2

Master bathroom

Looking into the master bathroom, closet on the left

Master bedroom, sitting area

Looking out the front window in the Master Bedroom

wash sink in the laundry room, washer and dryer will are in use where we live now

downstairs... still a bit of a mess :)
Kitchen... still a mess
downstairs bathroom