Okay so in the last 2 weeks we have:
1. Almost all our plumbing completed (our refrigerator had to be re-plumbed since I moved it)
2. Our water turned on
3. all electrical finished and inspection passed
4. All outlets and switches installed
5. Stairs finished
6. Ceiling painted
7. All cabinets installed and ready for handles
8. The stucco guys have will finish their job within the next day or so. They are only doing bands around the windows to assure no water gets in
9. The hardy board is going up ...
The side of the house facing Granada before.. |
the side of the house facing Granada after :) |
The back of the house |
The completed Kitchen |
refrigerator with build ins |