Sunday, May 20, 2012

5/17/2012

The kitchen before we moved things around


The boys bathroom

the master bathroom before the floor tiles

the pebble tiles before they went in

the entry way to the Master bathroom

Looking downstairs


the oversized refrigerator I had to have that changed the kitchen for the 3rd time
before the change

before


a close up of the master bath


the floor in the master bathroom

No comments:

Post a Comment