This is our bathroom tile.. |
The master closet and bathroom |
the boys room |
The second loft |
The master bedroom from the far corner, to the left is the closet and bathroom |
Looking up the stairs from downstairs |
downstairs looking out the back door |
from the corner looking at the kitchen |
the kitchen (island to the right) |
the door leading to the garage, to the right is the pantry |
I think this is the boys room?? |
The boys loft |
1. Roofers (weather allowing)
2. Paint is arriving
3. Stucco guy (for bottom quarter of house)
4. Top 3/4 of house will be hardy board
No comments:
Post a Comment