Tuesday, May 1, 2012

The Drywall is complete!!

After (what felt like) a long time the drywall is up, mudded, and all ready for paint!
This is our bathroom tile..
The master closet and bathroom

the boys room

The second loft

The master bedroom from the far corner, to the left is the closet and bathroom

Looking up the stairs from downstairs

downstairs looking out the back door

from the corner looking at the kitchen

the kitchen (island to the right)

the door leading to the garage, to the right is the pantry

I think this is the boys room??

The boys loft
On the schedule for this week:
1. Roofers (weather allowing)
2. Paint is arriving
3. Stucco guy (for bottom quarter of house)
4. Top 3/4 of house will be hardy board