| This is our bathroom tile.. |
| The master closet and bathroom |
| the boys room |
| The second loft |
| The master bedroom from the far corner, to the left is the closet and bathroom |
| Looking up the stairs from downstairs |
| downstairs looking out the back door |
| from the corner looking at the kitchen |
| the kitchen (island to the right) |
| the door leading to the garage, to the right is the pantry |
| I think this is the boys room?? |
| The boys loft |
1. Roofers (weather allowing)
2. Paint is arriving
3. Stucco guy (for bottom quarter of house)
4. Top 3/4 of house will be hardy board
No comments:
Post a Comment